Guía del Nivel 137 de Dreamy Room
Guía completa para el Nivel 137 del juego Dreamy Room
Dreamy Room Level 137 Walkthrough & Guide
Welcome to Dreamy Room Level 137! This level challenges you to construct a fully equipped, two-story Fire Station. You'll start by outfitting the interior office and crew areas, then move to assembling the building's exterior, including a fire truck and helicopter. Precision and thematic understanding are key to success.
Step 1: Preparing the Fire Station Interior Dreamy Room Level 137
The level begins with an empty room, representing the ground floor interior of the fire station.
- Initial Box: A delivery box will appear, containing the first set of items for the office and utility space.
- Item Emergence: Items will pop out sequentially, ready for placement.
Step 2: Wall Fixtures and Essential Equipment Dreamy Room Level 137
Begin by setting up the foundational elements on the walls and floor.
- Wall-Mounted Items: Place the red fire alarm disc, the clock, the green sponge-like block, the "Courage, Honor, Duty" sign, the window frame, and later the air conditioning unit on the designated wall spots.
- Tool & Safety Boards: Install the pegboard for tools and the "Duty Roster" board.
- Ladder Placement: Position the red and yellow extendable ladder against the wall.
- Early Floor Items: Place any initial tools like axes or the handheld vacuum cleaner that appear.
Step 3: Furnishing the Office and Crew Quarters Dreamy Room Level 137
With wall basics in place, add the main furniture for the station's personnel.
- Core Furniture: Set up the office desk, the red storage locker, and the iconic fire pole that extends to the ceiling.
- Desk Accessories: Populate the desk with items such as the calendar, radio, telephone, desk lamp, computer, and small plants as they become available.
- Pegboard Items: Hang axes, a fire helmet, and a coffee cup on the pegboard.
Step 4: Stocking Gear, Safety Items, and Amenities Dreamy Room Level 137
Now, fill the station with essential firefighter gear and crew comforts.
- Firefighter Gear: Place firefighter jackets (on the pole, on shelves), trousers, boots, helmets, and gas masks in their appropriate locations (lockers, shelves, near the pole).
- Safety Equipment: Position fire extinguishers, fire hoses (including the reel on the wall), first aid kits, and various tools (shovels, additional axes) around the room.
- Station Amenities: Arrange the small table and chairs, coffee machine, coffee cups, and informational charts/maps.
- Storage Solutions: Utilize the wooden shelf/bench unit and the locker for storing items like maps, donuts, and files.
- Alert Systems: Install the prominent alarm bell and any other signaling devices.
Step 5: Transition to Exterior Assembly Dreamy Room Level 137
Once all interior items are correctly placed, the focus shifts to the building's exterior.
- New Delivery: A new box will appear, signaling the start of the exterior construction phase. The interior view will change to an exterior view of the basic building shell.
Step 6: Constructing the Fire Station Exterior Dreamy Room Level 137
Assemble the main components of the fire station building.
- Fire Truck: The large red fire truck is a primary element; place it in the station's garage bay.
- Doors and Windows: Install all doors and windows on both the ground and upper floors of the station.
- Ventilation Units: Attach the various boxy ventilation units to the roof and sides of the building.
- Signage: Place the "Fire Station" sign above the garage and any "No Parking" signs.
Step 7: Rooftop, Air Support, and Final Exterior Details Dreamy Room Level 137
Complete the building with rooftop features and ground-level details.
- Helipad and Helicopter: Assemble the large "H" helipad on the main roof section and place the red rescue helicopter on it.
- Rooftop Accessories: Add the weather vane/anemometer and any communication aerials or sirens to the roof sections.
- Building Adornments: Attach the flag to the side of the building.
- Ground Details: Position the exterior barrier/fencing near the front.
Step 8: Final Review and Level Completion Dreamy Room Level 137
With all components in place, the fire station is complete.
- Inspect Placements: Quickly scan the fully assembled exterior to ensure everything looks correct and securely attached.
- Level End: The "Level Completed!" screen will appear, rewarding your efforts with a gift box.
Tips & Strategy
- Phased Approach: The level clearly divides into interior furnishing and exterior construction. Complete one phase fully before the next begins.
- Thematic Logic: Items generally fit logically within a fire station context (e.g., gear in lockers, tools on boards, vehicles in bays).
- Shadow Guides: Pay close attention to subtle shadow outlines on walls or floors, which often indicate correct placement for items.
- Item Count: This level has many small items, especially in the interior phase. Be patient and methodical.
Key Challenges
- The sheer volume of small decorative and functional items for the interior can be time-consuming to place accurately.
- Ensuring all structural components for the exterior (windows, vents, doors) are correctly oriented and attached to the building shell.
- Keeping track of which items belong to which phase if you're trying to anticipate placements.